Bathroom renovation during wall tiling and first installation stage

Bathrooms

Bathroom renovation in progress

Photographs of preparation, tiling and installation, including views taken at approximately 90% completion.

DuringWall tiling and installation in progress
DuringCareful preparation and measured setting-out
DuringTile layout and alignment in progress
DuringWalk-in shower area taking shape
DuringVanity, mirror and wall lighting
DuringLarge-format feature wall
DuringFixtures and wood-effect floor finish installed
DuringA coordinated, practical layout
DuringWall-hung WC and clean floor lines
DuringThe room at approximately 90% completion
Leave us a Google review

Discuss your property
with Flawless Interiors.

Send the postcode, photographs and a short description of the work you are considering. We will confirm whether the project is within our service area and arrange the next step.

Flawless Interiors Ltd
120 Longridge Way, Weston-super-Mare BS24 7BS
07771 140007
info@flawlessinteriorsltd.co.uk
Opening hoursMonday–Friday: 08:00–17:00Saturday: 08:00–14:00Sunday: Closed

Request a free, no-obligation quotation

Tell us about your project. Photos or plans can be sent by email or WhatsApp.

Enter an email address or phone number so we can reply.

We use these details to respond to your enquiry and manage the quotation. How we handle enquiry details.